Works on Waterway Permits

Many practices in the past have caused major degradation to our waterways. For example, poorly constructed crossings and other structures can cause erosion, obstruct water flow and hinder the passage of aquatic life.

To protect our rivers and creeks it is important that new activities or works undertaken in and around waterways do not adversely affect the health of those waterways.

If you plan to construct works or undertake activities in, under, on or over the bed and banks of a Designated Waterway (see definition below) in the North East CMA region you require a Works on Waterways Permit from the North East CMA issued under the Waterways Protection By-law.

Works and/or activities requiring a permit may include:

  • Access crossings including bridges, culverts and fords
  • Services/utility crossings including water, electricity and sewer pipelines
  • Stormwater outlets
  • Stabilisation works such as bank protection, battering and retaining structures
  • Vegetation and debris removal, such as willows
  • Sand and gravel extraction
  • Waterway rehabilitation works, such as replacing large wood

Ensuring that your proposed works are designed appropriately and that construction impacts are minimised will help to protect our waterways.

Find out more about the Waterway Protection ByLaw 2024

What are designated waterways?

Designated waterways include named and unnamed, permanent or seasonal waterways and range in size from major rivers to natural depressions. Designated waterways are declared under the Water Act 1989.

To confirm if your proposed works are located on a designated waterway, please contact North East CMA.

Are there any exemptions to the requirement for a Works on Waterways Permit?

In general, works associated with:

  • a licence to take and use water; or
  • the right to water; or
  • a dam or weir situated on a designated waterway for which a licence has been issued; or

do not require a Works on Waterways permit from the CMA.  Such works are normally licensed or approved by the Rural Water Authorities and are exempt from the Works on Waterways Permit scheme, provided there is to be no waterway deviation. Goulburn Murray Water is the relevant Rural Water Authority in the North East CMA region – phone 1800 013 357.

Other exemptions exist under the Waterways Protection By-law (Clause 8) however where an exemption applies you must still apply (via the Works on Waterways Permit Application Form) to enable the issue of guidelines for the works.

How to apply for a permit

Step 1. Access the permit application form and works guidelines below (include link to additional resources).

Step 2. Fill in the application form providing as much detail as possible, including landholder consent which may be private or public land. Submit to the North East CMA via:

  • Email: planning@necma.vic.gov.au
  • Post: PO Box 616, Wodonga VIC 3689
  • In person: Level 1, 104 Hovell Street, Wodonga VIC 3690

Step 3. North East CMA assesses the application. Assessments of applications can take up to 30 business days. Depending on the complexity of works, further information or a site visit may be required to progress your application. Most applications are completed within xx days.

Step 4. Subject to the application and proposed works being deemed as satisfactory, a permit may be issued. Where an email address has been provided, the permit will be emailed to the applicant when issued.

Step 5. Any person who carries out works or activities for which a permit has been issued must:

  • obtain a copy of the permit and understand the scope of the activity or works approved;
  • be familiar with and comply with the permit conditions.

For further information in relation to the permit process or to discuss your application you can contact the Statutory Planning Team directly at planning@necma.vic.gov.au  or Phone 1300 216 513.

Note:

  • Some ground disturbing activities may require the preparation of a Cultural Heritage Management Plan (CHMP) by a suitably qualified Heritage Advisor.  It is your responsibility to determine whether a CHMP is required.  A copy of the outcome of this process must be submitted with your Works on Waterways application.  For further information please contact First Peoples - State Relations or phone on 1800 762 003 or Cultural Heritage Management Plans | firstpeoplesrelations.vic.gov.au
  • There is no cost to obtain a Works permit from us, however, a Works on Waterways Permit application form must be completed and submitted to us for approval.  Works or activities on a designated waterway cannot commence until a permit has been issued.
  • Unless otherwise stated, issued permits are valid for one year from the date of issue (unless earlier revoked by the CMA).
  • The North East CMA may arrange with you to inspect the works site before, during or after works.